written by ABBTA1PSUK on 07/03/2022
It all started with a visit from a local representative. He was excellent, no pressure, clear description, full walkthrough of options, installation and costs. In light of the current energy situation, we could not refuse to go ahead and 6-8 weeks later, the scaffolding was efficiently erected, by a personable team. The installation closely followed. 16 panels, electric supply metered, batteries and inverter installed(in the loft), all within 5 hours, and up and running. Full installation documentation supplied and mobile application loaded to give me visibility of the operation of the system. Very efficient, and smooth installation, by a great 2 man team.