Written on: 02/03/2012 by Chaddy12
Working on my own the frame took 6 hours to construct, the glazing took around the same time but I was hampered by windy conditions. Instructions were pretty easy to follow and any mistakes were down to me not paying enough attention to the plans. I would advise wearing a pair of gloves while doing the glazing.
Ideally the product would include extra glazing clips and the better quality bolts as a number did shear whilst tightening. Use as many of the 'W' glazing clips as you can fit on a panel as you are oversupplied.